Case studies
Retirement village
Mitigating power disruption risks with an uninterruptible power supply (UPS) infrastructure
TIS installed an uninterruptible power supply (UPS) system for ExtraCare Solihull that provides battery backup and ensures critical systems across the site remain operational in the event of a power failure.
Protecting the 2022 Commonwealth Games
TIS was appointed by the West Midlands Combined Authority (WMCA) to implement a new transport route network designed specifically for the 2022 Birmingham Commonwealth Games, the largest multi-sport event held in the UK since the 2012 Olympic Games.
Retirement village
Design and installation of a groundbreaking fire alarm system
Design and installation of a groundbreaking, fully compliant fire alarm system that would be active throughout the communal and private apartment spaces and across the entire Solihull site.
Retirement village
A new commercially viable specification for Audley Mayfield IRCs
Designing and developing Mayfield's new 'mid-range' integrated retirement community specification for Audley Group.
Complex upgrade at Audley St Elphins Park
Designing and installing a converged life safety and security system that would allow disparate technologies to work reliably together as part of a complex upgrade.
Retirement village
Protecting ExtraCare’s Solihull Integrated Retirement Community
Designing and installing a converged life safety and security system that would allow disparate technologies to work reliably together through a single common communication platform.