Binswood Retirement Village

Binswood Retirement Village

Client:

Audley Retirement

Location:

Binswood Avenue, Royal Leamington Spa

Project Manager:

Roger Hands

Job Details:

Binswood Retirement Village – Installation of TV, Telecoms, and Life Critical Safety Systems to 88 luxury apartments and communal areas.


Systems Installed:

Fire Alarm, PBX Telephony, DECT, Intruder Alarm, CCTV, Access Control, Door Entry, Warden Call, Data Infrastructure

The Challenge/Brief:

The Binswood project currently consists of four phases, Phase 1, a Grade II listed Victorian Gothic hall, started in 2013, Phase 2 was 2015, Phase 3 completed in 2016, and Phase 4 is planned for 2018. The challenge on a project of this scale and technological content, was the protracted build time. We had to ensure that the systems and infrastructure installed within the first phase was flexible and adaptable enough to accommodate whatever changes in technology, equipment, and client operations may be required in the later phases.

It is testament to TIS’ ethos of continual improvement and development and our flexible approach to design that throughout the phases the technology utilised evolved from purely analogue, through hybrid, and eventually to fully IP, whilst maintaining and exceeding the clients requirements.

All properties in this prestigious scheme come equipped with the cutting-edge technology, installed by TIS in an unobtrusive manner in keeping with the luxurious style of the properties.