Menu
0333 8000 300 search close

London Victoria Station

The outer frame was constructed from KESTREL aluminium sections and the door was a 12mm toughened glazed panel with top and bottom rails. The door was automated using a DORMA ED100 low energy swing unit, Activation was via 2No push pads, opening ab closing face safety sensors were also fitted.

The Challenge/Brief:

The client required the refurbishment of the information centre, this entailed the removing of the existing timber door and frame and fitting the new aluminium screen and glass door.

Get In Touch

Sign-up for our latest news

arrow_upward